NEXT SPACEFLIGHT

Status

Success

Apstar-6D

Launch Time
Thu Jul 09, 2020 12:11 UTC

The rocket was modified on this flight to be able to launch 5550 kg to GTO. The CZ-3B can only launch 5500 kg on normal flights.

Rocket

Long March 3B/E
Image Credit: CASC
CASC
Status: Active
Price: $29.15 million
Liftoff Thrust: 5,986 kN
Payload to LEO: 11,500 kg
Payload to GTO: 5,550 kg
Stages: 3
Strap-ons: 4
Rocket Height: 56.3 m
Fairing Diameter: 4.2 m
Fairing Height: 9.56 m

Mission Details

Apstar-6D

APT Satellite signed in July 2016 a contract with China Great Wall Industry Corp. (CGWIC) of Beijing for the construction and launch of the APStar-6D Ka-band high throughput communications satellite.

APStar 6D will likely be built on CAST's DFH-5 platform. The satellite has a 15-year life time. It will feature an electric propulsion system.

Payloads: 1
Total Mass: 5,550.0 kg
Geostationary Transfer Orbit

Location

LC-3, Xichang Satellite Launch Center, China

Stats

2020

50th orbital launch attempt

Long March 3

126th mission
5th mission of 2020
118th successful mission
2nd consecutive successful mission