/
Launch Success
Liftoff Time (GMT)
16:20:00
Wednesday December 20, 2000
The BD 1 (Beidou 1) satellites were the 1st phase of the Chinese Beidou (Compass) satellite navigation system. The first phase uses only geostationary satellites, in contrast to GPS and GLONASS. This reduces the number of satellites but limits the coverage to a less-than-hemispherical area. The basic constellation requires 3 satellites. The satellites are based on the DFH-3 Bus.
Geostationary Transfer Orbit
1 Payload
2,200 kilograms
Agency
CASCPrice
$69.70 million
Rocket
Height: 52.52m
Payload to Orbit
LEO: 8,500 kg
GTO: 2,600 kg
Liftoff Thrust
2,962 Kilonewtons
Fairing
Diameter: 3.35m
Height: 8.89m
Stages
3
24th
Mission
4th
Mission of 2000
84th
Orbital launch attempt