NEXT SPACEFLIGHT

Status

Success

STS-37

Launch Time
Fri Apr 05, 1991 14:22 UTC

Rocket

Space Shuttle Atlantis
NASA
Status: Retired
Price: $450.0 million
Liftoff Thrust: 30,250 kN
Payload to LEO: 27,500 kg
Payload to GTO: 3,810 kg
Stages: 2
Strap-ons: 2
Rocket Height: 56.1 m

Vehicles

Kennedy SLF Runway 33

OV-104

Flight #8
141 day turnaround

Mission Details

STS-37

The primary payload, the Gamma Ray Observatory (GRO), was deployed on flight day 3. GRO's high-gain antenna failed to deploy on command; it was finally freed and manually deployed by Ross and Apt during an unscheduled contingency space walk, the first since April 1985. The following day, the two astronauts performed the first scheduled space walk since November 1985 to test means for astronauts to move themselves and equipment about while maintaining the then-planned Space Station Freedom. GRO science instruments were Burst and Transient Source Experiment (BATSE), Imaging Compton Telescope (COMPTEL), Energetic Gamma Ray Experiment Telescope (EGRET) and Oriented Scintillation Spectrometer Experiment (OSSE).

Total Mass: 17,204.0 kg
Low Earth Orbit

Location

LC-39B, Kennedy Space Center, Florida, USA

Stats

1991

27th orbital launch attempt

Space Shuttle

39th mission
1st mission of 1991
38th successful mission
14th consecutive successful mission