NEXT SPACEFLIGHT

Status

Success

STS-43

Launch Time
Fri Aug 02, 1991 15:01 UTC

Rocket

Space Shuttle Atlantis
NASA
Status: Retired
Price: $450.0 million
Liftoff Thrust: 30,250 kN
Payload to LEO: 27,500 kg
Payload to GTO: 3,810 kg
Stages: 2
Strap-ons: 2
Rocket Height: 56.1 m

Vehicles

Kennedy SLF Runway 15

OV-104

Flight #9
119 day turnaround

Mission Details

STS-43

The primary payload, Tracking and Data Relay Satellite-5 (TDRS-5 or TDRS-E), attached to an Inertial Upper Stage (IUS), was deployed about six hours into flight, and the IUS propelled the satellite into geosynchronous orbit. TDRS-5 became the fourth member of the orbiting TDRS cluster. Secondary payloads were Space Station Heat Pipe Advanced Radiator Element II (SHARE II); Shuttle Solar Backscatter Ultra-Violet (SSBUV) instrument; Tank Pressure Control Equipment (TPCE) and Optical Communications Through Windows (OCTW). Other experiments included Auroral Photography Experiment (APE-B) Protein Crystal Growth Ill (PCG Ill); Bioserve / Instrumentation Technology Associates Materials Dispersion Apparatus (BIMDA); Investigations Into Polymer Membrane Processing (IPMP); Space Acceleration Measurement System (SAMS); Solid Surface Combustion Experiment (SSCE); Ultraviolet Plume imager (UVPI); and the Air Force Maui Optical Site (AMOS) experiment.

Total Mass: 21,067.0 kg
Low Earth Orbit

Location

LC-39A, Kennedy Space Center, Florida, USA

Stats

1991

56th orbital launch attempt

Space Shuttle

42nd mission
4th mission of 1991
41st successful mission
17th consecutive successful mission