NEXT SPACEFLIGHT

Status

Success

AMOS 3

Launch Time
Mon Apr 28, 2008 05:00 UTC

The orbit reached was lower than expected due to a computer system malfunction. However, it remained within the margins. First flight of Land Launch.

Rocket

Zenit-3 SLB
Image Credit: Roscosmos
Land Launch
Status: Retired
Liftoff Thrust: 7,257 kN
Payload to LEO: 13,740 kg
Payload to GTO: 5,000 kg
Stages: 3
Strap-ons: 0
Rocket Height: 59.46 m
Fairing Diameter: 4.1 m
Fairing Height: 10.4 m

Mission Details

AMOS 3

Spacecom Satellite Communications has signed an agreement in September 2005 with Israel Aircraft Industries (IAI) to buy its third satellite, AMOS 3, from the Israeli defense contractor.

IAI will start construction of the communications satellite immediately and launch the AMOS-3 in December 2007. The cost of the new satellite is $170 million.
The new satellite will include 15 high-capacity transponders in the Ku- and Ka-band delivered by two antennae, both of which will have ground-controlled broadcasting capability. The AMOS-3 will cover the Middle East, Europe, Africa, and parts of the Americas.

Payloads: 1
Total Mass: 1,250.0 kg
Geostationary Transfer Orbit

Location

Site 45/1, Baikonur Cosmodrome, Kazakhstan

Stats

2008

22nd orbital launch attempt

Zenit

64th mission
3rd mission of 2008
52nd successful mission
4th consecutive successful mission