Thuraya-2

Launch Success

Liftoff Time (GMT)

13:55:59

Tuesday June 10, 2003

Mission Details

Thuraya-2

Wiki

Thuraya-2 and 3 are among the first satellites in the Boeing GEM series. This product line expands Boeing's offerings beyond satellite manufacturing, to integrate a high-power geosynchronous satellite with a ground segment and user handsets, to provide a range of cellular-like voice and data services over a large geographic region. The Thuraya ground segment includes terrestrial gateways plus a collocated network operations center and satellite control facility in the UAE. Thuraya offers GSM-compatible mobile telephone services, transmitting and receiving calls through a single 12.25 meter-aperture reflector. The satellite employs state-of-the-art on-board digital signal processing to create more than 200 spot beams that can be redirected on-orbit, allowing the Thuraya system to adapt to business demands in real time. Calls are routed directly from one handheld unit to another, or to a terrestrial network. The system has the capacity for 13,750 simultaneous voice circuits. Thuraya 2 and 3 have redesigned solar arrays, as the original concentrator arrays have a fogging problem reducing the performance.

Geostationary Transfer Orbit

1 Payload

5,177 kilograms

Rocket

Retired
Zenit-3 SL

Active 1999 to 2014

Yuzhmash logo

Manufacturer

Yuzhmash

Rocket

Height: 59.46m

Payload to Orbit

LEO: 13,740 kg

GTO: 6,000 kg

Liftoff Thrust

7,257 Kilonewtons

Fairing

Diameter: 4.1m

Height: 10.4m

Stages

3

Launch Site

LP Odyssey

Kiritimati Launch Area, Pacific Ocean

Fastest Turnaround

50 days 23 hours

Stats

Zenit


44th

Mission

1st

Mission of 2003

2003


26th

Orbital launch attempt