Launch Success
Liftoff Time (GMT)
14:29:00
Wednesday June 15, 2016
Watch Replay
Official Livestream
Read Article
Fastest droneship turnaround to date, at 18 days and 17 hours.
Second all-electric propulsion satellite launched in 2016. The satellite was funded by a US Ex-Im bank loan to expand high-tech US jobs; the loan also funded the ABS-3A.
Geostationary Transfer Orbit
1 Payload
2,000 kilograms
Satelites Mexicanos S.A.B. de C.V. (Satmex) announced in July 2013, that it has contracted with the construction of Satmex 9 to Boeing Satellite Systems as part of a four satellite ABS/SATMEX deal. SATMEX was acquired be Eutelsat in 2014 and was rebranded Eutelsat Americas. In May 2014, it was renamed Eutelsat 117 West B.
Geostationary Transfer Orbit
1 Payload
1,963 kilograms


Agency
SpaceXPrice
$62.00 million
Rocket
Diameter: 3.7m
Height: 70m
Payload to Orbit
LEO: 22,800 kg
GTO: 8,300 kg
Liftoff Thrust
6,804 Kilonewtons
Fairing
Diameter: 5.2m
Height: 13m
Stages
2
26th
Mission
6th
Mission of 2016
31st
Mission
6th
Mission of 2016
38th
Orbital launch attempt