Launch Success
Liftoff Time (GMT)
10:46:59
Thursday March 31, 1966
First satellite around the Moon.
The spacecraft entered lunar orbit on April 3, 1966 and completed its first orbit 3 hours later (on April 4, Moscow time). After a midcourse correction on 1 April, Luna 10, the second of two hastily prepared Soviet Ye-6S probes (that is, the backup), successfully entered lunar orbit two days later at 18:44 UT. A 245-kilogram instrument compartment separated from the main bus, which was in a 350 x 1,000-kilometer orbit inclined at 71.9° to the lunar equator. Luna 10 was battery powered and operated for 460 lunar orbits and 219 active data transmissions before radio signals were discontinued on May 30, 1966.
Lunar orbit
1 Payload
1,582 kilograms
Manufacturer
RKK EnergiyaRocket
Height: 44.23m
Payload to Orbit
LEO: 6,200 kg
GTO: 2,400 kg
Liftoff Thrust
4,391 Kilonewtons
Fairing
Diameter: 2.58m
Height: 6.74m
Stages
4
Strap-ons
4
4th
Mission
3rd
Mission of 1966
182nd
Mission
17th
Mission of 1966
31st
Orbital launch attempt