NEXT SPACEFLIGHT

Status

Success

P73-3

Launch Time
Sun Jul 14, 1974 05:17 UTC

Rocket

Atlas-E/F PTS
Image Credit: USAF or NASA
General Dynamics
Status: Retired
Payload to LEO: 295 kg
Stages: 2
Strap-ons: 0

Mission Details

NTS 1 (P73-3)

In 1973, the Timation program was merged with the Air Force's 621B program, with the Air Force being named the Executive Service, to form the NAVSTAR GPS program. NRL'S Timation 3 satellite was redesignated the NTS-1 (Navigation Technology Satellite 1) and was launched in the summer of 1974 in connection with the NAVSTAR effort. NTS-1 had two rubidium-vapor frequency standards (clocks), while the earlier Timation satellites had carried selected high-performance crystal oscillator clocks to test the NRL theory.

Payloads: 1
Total Mass: 293.0 kg

Location

SLC-3W, Vandenberg SFB, California, USA

Stats

1974

59th orbital launch attempt

Atlas-PTS

1st mission
1st mission of 1974
1st successful mission