NEXT SPACEFLIGHT

Status

Success

STS-74

Launch Time
Sun Nov 12, 1995 12:30 UTC

Rocket

Space Shuttle Atlantis
NASA
Status: Retired
Price: $450.0 million
Liftoff Thrust: 30,250 kN
Payload to LEO: 27,500 kg
Payload to GTO: 3,810 kg
Stages: 2
Strap-ons: 2
Rocket Height: 56.1 m

Vehicles

Kennedy SLF Runway 33

OV-104

Flight #15
138 day turnaround

Mission Details

STS-74

STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. The shuttle delivered a pair of solar arrays along with the Russian-built Mir Docking Module to allow docking with the station by the space shuttle without moving Mir's Kristall module. During the three-day docking, the Russian, Canadian, and American crew transferred supplies and equipment between Atlantis and Mir, moved several long-term experiments, and upgraded the station with new equipment, particularly during the installation of the docking module.

Total Mass: 6,134.0 kg
Low Earth Orbit

Location

LC-39A, Kennedy Space Center, Florida, USA

Stats

1995

67th orbital launch attempt

Space Shuttle

73rd mission
7th mission of 1995
72nd successful mission
48th consecutive successful mission