Next Spaceflight

Status

Success

STS-124

Launch Time
Sat May 31, 2008 21:02 UTC

Rocket

Space Shuttle Discovery
NASA
Status: Retired
Price: $450.0 million
Liftoff Thrust: 30,250 kN
Payload to LEO: 27,500 kg
Payload to GTO: 3,810 kg
Stages: 2
Strap-ons: 2
Rocket Height: 56.1 m

Vehicles

OV-103

Flight #35
Kennedy SLF Runway 15

Mission Details

STS-124

STS-124 delivered the Pressurized Module (PM) of the Japanese Experiment Module (JEM), called Kibō, to the International Space Station (ISS). Kibō was berthed to the Harmony module and the pressurized section of the JEM Experiment Logistics Module, brought up by the STS-123 crew, was moved from Harmony to the JEM-PM. The Japanese Remote Manipulator System, a robotic arm, was also delivered by STS-124 and attached to Kibō. The entire Kibō laboratory is being brought up over three missions.
Total Mass: 17,530 kg
Low Earth Orbit

Location

Stats

Space Shuttle

123rd mission
121st successful mission
10th consecutive successful mission