NEXT SPACEFLIGHT

Status

Suborbital
Failure

Mercury-Redstone 1 (MR-1)

Launch Time
Mon Nov 21, 1960 14:00 UTC

Rocket shutdown just after ignition.

Rocket

Mercury-Redstone
Image Credit: NASA
NASA
Status: Retired
Liftoff Thrust: 350 kN
Payload to LEO: 0 kg
Stages: 1
Strap-ons: 0
Rocket Height: 25.4 m

Mission Details

Mercury-Redstone 1

Mercury-Redstone 1 (MR-1) was the first Mercury-Redstone unmanned flight test in Project Mercury and the first attempt to launch a Mercury spacecraft with the Mercury-Redstone Launch Vehicle. Intended to be an unmanned sub-orbital spaceflight, it was launched on November 21, 1960 from Cape Canaveral Air Force Station, Florida. The launch failed in a peculiar fashion which has been referred to as the "four-inch flight".

Payloads: 1
Suborbital

Location

LC-5, Cape Canaveral SFS, Florida, USA

Stats

Mercury-Redstone

1st mission
1st mission of 1960
1st failed mission