NEXT SPACEFLIGHT

Status

Success

STS-94

Launch Time
Tue Jul 01, 1997 18:02 UTC

Rocket

Space Shuttle Columbia
NASA
Status: Retired
Price: $450.0 million
Liftoff Thrust: 30,250 kN
Payload to LEO: 27,500 kg
Payload to GTO: 3,810 kg
Stages: 2
Strap-ons: 2
Rocket Height: 56.1 m

Vehicles

Kennedy SLF Runway 33

OV-102

Flight #23
88 day turnaround

Mission Details

STS-94

This was a reflight of the STS-83 Microgravity Science Laboratory (MSL) mission. MSL was originally launched on 4 April 1997 at 2:20 pm EST and was intended to be on orbit for 15 days, 16 hours. The mission was cut short due to a problem with Fuel Cell #2 and Columbia landed on 8 April 1997 after 3 days 23 hours.

The primary payload on STS-83 was the Microgravity Science Laboratory (MSL). MSL was a collection of microgravity experiments housed inside a European Spacelab Long Module (LM). It built on the cooperative and scientific foundation of the International Microgravity Laboratory missions (IML-1 on STS-42 and IML-2 on STS-65), the United States Microgravity Laboratory missions (USML-1 on STS-50 and USML-2 on STS-73), the Japanese Spacelab mission (Spacelab-J on STS-47), the Spacelab Life and Microgravity Science Mission (LMS on STS-78) and the German Spacelab missions (D-1 on STS-61-A and D-2 on STS-55).

Total Mass: 10,169.0 kg
Low Earth Orbit

Location

LC-39A, Kennedy Space Center, Florida, USA

Stats

1997

34th orbital launch attempt

Space Shuttle

85th mission
5th mission of 1997
84th successful mission
60th consecutive successful mission