Apstar 9

Launch Success

Liftoff Time (GMT)

16:16:00

Friday October 16, 2015

Mission Details

Read Article

Apstar 9

Wiki

APT Satellite signed in November 2013 a contract with China Great Wall Industry Corp. (CGWIC) of Beijing for the construction and launch of the APStar-9 high-power communications satellite. APStar 9 was built on CAST's DFH-4 platform and features 32 transponders in C-band and 14 in Ku-band. The satellite has a 15-year lifetime. It was launched in 2015 on a Chinese CZ-3B/G2 booster. TS Global Network (TSGN), a Very Small Aperture Terminal (VSAT) connectivity provider in Malaysia, has entered an agreement with APT Satellite Company Limited to invest in a designated payload on the operator’s Apstar 9 satellite. The payload, dubbed MySat 1, will provide C-band transponder capacity for the Association of South East Asian Nations (ASEAN) and Asia-Pacific markets.

Geosynchronous Orbit

1 Payload

Rocket

Active
Long March 3B/E

Active Since 2007

China Aerospace Science and Technology Corporation logo

Agency

CASC

Price

$29.15 million

Rocket

Height: 56.3m

Payload to Orbit

LEO: 11,500 kg

GTO: 5,550 kg

Liftoff Thrust

5,986 Kilonewtons

Fairing

Diameter: 4.2m

Height: 9.56m

Stages

3

Strap-ons

4

Launch Site

LC-2

Xichang Satellite Launch Center, China

Fastest Turnaround

18 days

Stats

Long March 3


79th

Mission

5th

Mission of 2015

2015


62nd

Orbital launch attempt