NEXT SPACEFLIGHT

Status

Success

Apstar 9

Launch Time
Fri Oct 16, 2015 16:16 UTC

Rocket

Long March 3B/E
Image Credit: CASC
CASC
Status: Active
Price: $29.15 million
Liftoff Thrust: 5,986 kN
Payload to LEO: 11,500 kg
Payload to GTO: 5,550 kg
Stages: 3
Strap-ons: 4
Rocket Height: 56.3 m
Fairing Diameter: 4.2 m
Fairing Height: 9.56 m

Mission Details

Apstar 9

APT Satellite signed in November 2013 a contract with China Great Wall Industry Corp. (CGWIC) of Beijing for the construction and launch of the APStar-9 high-power communications satellite.

APStar 9 was built on CAST's DFH-4 platform and features 32 transponders in C-band and 14 in Ku-band. The satellite has a 15-year lifetime. It was launched in 2015 on a Chinese CZ-3B/G2 booster.

TS Global Network (TSGN), a Very Small Aperture Terminal (VSAT) connectivity provider in Malaysia, has entered an agreement with APT Satellite Company Limited to invest in a designated payload on the operator’s Apstar 9 satellite. The payload, dubbed MySat 1, will provide C-band transponder capacity for the Association of South East Asian Nations (ASEAN) and Asia-Pacific markets.

Payloads: 1
Geosynchronous Orbit

Location

LC-2, Xichang Satellite Launch Center, China

Stats

2015

62nd orbital launch attempt

Long March 3

79th mission
5th mission of 2015
73rd successful mission
36th consecutive successful mission