NEXT SPACEFLIGHT

Status

Success

SES-1

Launch Time
Sat Apr 24, 2010 11:18 UTC

Rocket

Proton-M/Briz-M
ILS
Status: Active
Price: $65.0 million
Liftoff Thrust: 10,027 kN
Payload to LEO: 21,000 kg
Payload to GTO: 6,900 kg
Stages: 4
Strap-ons: 0
Rocket Height: 58.18 m
Fairing Diameter: 4.35 m
Fairing Height: 15.26 m

Mission Details

SES-1

Orbital Sciences Corporation announced in May 2007 that it has received an order from SES AMERICOM for as many as five new satellites over a multi-year period. Orbital stated that SES AMERICOM has placed a firm order for two new satellites, the first designated as AMC-5R and the second a ground spare that was launched to another orbital location as a replacement satellite.

Deliveries of the first two satellites are scheduled for mid- and late-2009, respectively. In addition to the two satellites that Orbital will immediately begin constructing, the contract gives SES AMERICOM the option to order up to three more identical satellites over the next few years.

The AMC-5R and the identical ground spare spacecraft will be hybrid satellites, each carrying 24 active C-band and 24 Ku-band transponders of 36 MHz capacity. Some of the channels in each band will also be cross-strapped, enabling new service capabilities. Each spacecraft will generate approximately five kilowatts of payload power and will have two deployable reflectors.

Payloads: 1
Total Mass: 2,561.0 kg
Geostationary Transfer Orbit

Location

Site 200/39, Baikonur Cosmodrome, Kazakhstan

Stats

2010

17th orbital launch attempt

Proton-M

43rd mission
5th mission of 2010
40th successful mission
20th consecutive successful mission