Status
Chandrayaan-4 Second Launch
Launch Time
NET 2028
NET 2028
Chandrayaan-4 is composed of two launches, the first will launch the TM (Transfer Module) and RM (Re-entry Module) modules with the GSLV Mk II rocket to a GTO orbit and the second will launch the AM (Ascender Module) and LM (Lander Module) modules with the MLV-3 rocket to a TLI orbit.
Rocket
Mission Details
Chandrayaan-4
Chandrayaan-4 is a planned lunar sample-return mission of Indian Space Research Organisation (ISRO) and will be the fourth iteration in its Chandrayaan programme. It consist of four modules namely Transfer Module (TM), Lander Module (LM), Ascender Module (AM) and Re-entry Module (RM). The planned mission life is 1 lunar day and the landing site is near to Shiv Shakti Point, the landing site of Chandrayaan-3 Lander.