Status
Chandrayaan-4 Second Launch
Launch Time
NET 2027
NET 2027
Chandrayaan-4 is composed of two launches, the first will launch the DM (Descender Module) and AM (Ascender Module) and the second will launch the TM (Transfer Module), RM (Re-entry Module) and PM (Propulsion Module).
Rocket
Mission Details
Chandrayaan-4
Chandrayaan-4 is a planned lunar sample-return mission of Indian Space Research Organisation (ISRO) and will be the fourth iteration in its Chandrayaan programme. It consist of five modules namely Transfer Module (TM), Descender Module (DM), Ascender Module (AM), Propulsion Module (PM) and Re-entry Module (RM). The planned mission life is 1 lunar day and the landing site is near to Shiv Shakti Point, the landing site of Chandrayaan-3 Lander.
Payloads: 3
Total Mass: 4,600.0 kg